First I have about six relays I want to come on every day. First group Comes on. Then the second group Comes on a little later(seconds to min.) Next the second group turns off. Then the last group turns off.
Next I have to add a 9th relay. I have two four banks. So I need to add it to A/T hat. Also I need it to run on the scenario above. The relay can be. H or L.
Thank you
Hello Angelo,
I have been trying to get these issues fixed. Can't seem to get it working. Basically I need to open a valve first, then turn on a pump, water for a certain time. Then turn off pump then close the valve.This also used to change from R/O water and Fertilizer mixture. When you setup the Schema all relays get the same time.. Any help would be great.
Thank you
Skip